Abdominal pain critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
No edit summary
WikiBot (talk | contribs)
m Bot: Removing from Primary care
 
(50 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
__NOTOC__
{{Abdominal pain}}
{{CMG}}
{{CMG}}
==Definition==
* '''Acute abdomen''' is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web  | last =  | first =  | title = ICD-10 Version:2010 | url = http://apps.who.int/classifications/icd10/browse/2010/en#/R10.0 | publisher =  | date =  }}</ref> It is less than 24 hours in duration and may require surgical evaluation and intervention.


* Duration of abdominal pain
==Approach==
** Acute: several days
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
** Subacute: more than several days but less than 6 months
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}}
** Chronic: more than six months, either constantly or intermittently
|}
 
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Hemodynamically stable || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain duration critical pathways|Yes]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain with hemodynamic instability critical pathways|No]]
|}


* Immunocompromised and older patients may have atypical patterns of presentation.
==Definition==
* Abdominal pain is pain felt anywhere between the chest and the groin.
* Immunocompromised and elderly patients may have atypical patterns of presentation.
* A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.


==References==
==References==
Line 16: Line 20:
{{WikiDoc Help Menu}}
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}
{{WikiDoc Sources}}
[[Category:Disease]]
 
[[Category:Critical pathways]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Resident survival guide]]

Latest revision as of 20:13, 29 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources