Abdominal pain critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
No edit summary
WikiBot (talk | contribs)
m Bot: Removing from Primary care
 
(49 intermediate revisions by 2 users not shown)
Line 1: Line 1:
__NOTOC__
__NOTOC__
{{Abdominal pain}}
{{CMG}}
{{CMG}}
==Definition==
* Abdominal pain is considered acute if the duration is less than six months and chronic when it has been occurring over at least six months, either constantly or intermittently.<ref>{{Cite book  | last1 = Sleisenger | first1 = Marvin H. | last2 = Feldman | first2 = Mark | last3 = Friedman | first3 = Lawrence S. (Lawrence Samuel) | last4 = Brandt | first4 = Lawrence J. | title = Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen | date = 2010 | publisher = Saunders/Elsevier | location = Philadelphia , PA | isbn = 1-4160-6189-4 | pages =  }}</ref>


* '''Acute abdomen''' is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web  | last = | first = | title = ICD-10 Version:2010 | url = http://apps.who.int/classifications/icd10/browse/2010/en#/R10.0 | publisher =  | date =  }}</ref> It is less than 24 hours in duration and may require surgical evaluation and intervention.
==Approach==
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}}
|}


==Approach==
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
{| {{table}}
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Hemodynamically stable || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain duration critical pathways|Yes]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain with hemodynamic instability critical pathways|No]]
| bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[differential diagnosis project|'''No''']]
|}
|}
==Definition==
* Abdominal pain is pain felt anywhere between the chest and the groin.
* Immunocompromised and elderly patients may have atypical patterns of presentation.
* A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.


==References==
==References==
Line 16: Line 20:
{{WikiDoc Help Menu}}
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}
{{WikiDoc Sources}}
[[Category:Disease]]
 
[[Category:Critical pathways]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Resident survival guide]]

Latest revision as of 20:13, 29 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources