Abdominal pain critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
No edit summary
WikiBot (talk | contribs)
m Bot: Removing from Primary care
 
(16 intermediate revisions by 2 users not shown)
Line 3: Line 3:


==Approach==
==Approach==
{| {{table}}
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| bgcolor=lightyellow |[[Abdominal pain physician extender algorithm|Abdominal pain physician extender algorithm]]
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}}
|}
|}
{| {{table}}
 
| bgcolor=lightyellow |Hemodynamically stable?||bgcolor=lightgray |[[Abdominal pain duration physician extender algorithm|Yes]]||bgcolor=lightgray |[[Abdominal pain with hemodynamic instability physician extender algorithm|No]]
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Hemodynamically stable || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain duration critical pathways|Yes]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain with hemodynamic instability critical pathways|No]]
|}
|}


Line 17: Line 18:
==References==
==References==
{{Reflist|2}}
{{Reflist|2}}
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}


[[Category:Critical pathways]]
[[Category:Emergency medicine]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Primary care]]
[[Category:Signs and symptoms]]
[[Category:Physician extender algorithm]]
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}

Latest revision as of 20:13, 29 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources