Abdominal pain duration critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
m (Bot: Removing from Primary care) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 22: | Line 22: | ||
==References== | ==References== | ||
{{Reflist|2}} | {{Reflist|2}} | ||
{{WikiDoc Help Menu}} | |||
{{WikiDoc Sources}} | |||
[[Category:Critical pathways]] | [[Category:Critical pathways]] | ||
Line 28: | Line 30: | ||
[[Category:Gastroenterology]] | [[Category:Gastroenterology]] | ||
[[Category:Medicine]] | [[Category:Medicine]] | ||
Latest revision as of 20:14, 29 July 2020
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Duration of abdominal pain | Acute | Chronic |
Definition
- Acute abdominal pain has a duration of less than 6 months.
- Chronic abdominal pain has a duration of more than 6 months.[1]
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.