Abdominal pain with hemodynamic instability critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain with hemodynamic instability physician extender algorithm to Abdominal pain with hemodynamic instability critical pathways without leaving a redirect) |
Gerald Chi (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
{{CMG}} | {{CMG}} | ||
== | ==Critical Pathways== | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}} | | BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}} | ||
Line 12: | Line 12: | ||
==Definition== | ==Definition== | ||
* Hemodynamic status | |||
==Action items== | |||
* Stabilize the patient by IV challenge. | |||
==References== | ==References== |
Latest revision as of 16:16, 14 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Critical Pathways
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Definition
- Hemodynamic status
Action items
- Stabilize the patient by IV challenge.