Metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
m (Bot: Removing from Primary care) |
||
(8 intermediate revisions by one other user not shown) | |||
Line 2: | Line 2: | ||
{{CMG}} | {{CMG}} | ||
== | ==Critical Pathways== | ||
{| | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| | | BGCOLOR=FLORALWHITE | {{Smallcaps|[[Metabolic acidosis critical pathways|metabolic acidosis critical pathways]]}} | ||
|} | |} | ||
{| | |||
| | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Anion gap || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis critical pathways|High]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Normal anion gap metabolic acidosis critical pathways|Normal]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Low anion gap metabolic acidosis critical pathways|Low]] | |||
|} | |} | ||
==Definition== | ==Definition== | ||
* [[Metabolic acidosis]] is a state in which the blood [[pH]] is less than 7.35 due to increased production of H+ by the body or the inability of the body to form [[bicarbonate]] (HCO3-) in the kidney. | * [[Metabolic acidosis]] is a state in which the blood [[pH]] is less than 7.35 due to increased production of H<sup>+</sup> by the body or the inability of the body to form [[bicarbonate]] (HCO3<sup>-</sup>) in the kidney. | ||
* [[Anion gap]] = [Na+] - [Cl-] - [HCO3-] | * [[Anion gap]] = [Na<sup>+</sup>] - [Cl<sup>-</sup>] - [HCO3<sup>-</sup>] | ||
* Normal reference range for anion gap is between 8 and 16 meq/L.<ref name="isbn0-683-18272-2">{{cite book | author = Benjamin Abelow | authorlink = | editor = | others = | title = Understanding acid-base | edition = | language = | publisher = Williams & Wilkins | location = Baltimore | year = 1998 | origyear = | pages = | quote = | isbn = 0-683-18272-2 | oclc = | doi = | url = | accessdate = }}</ref><ref name="isbn1-4160-3105-7">{{cite book | author = Rector, Floyd C.; Brenner, Barry M. | authorlink = | editor = | others = | title = Brenner & Rector's the kidney | edition = | language = | publisher = Saunders Elsevier | location = | year = 2008 | origyear = | pages = | quote = | isbn = 1-4160-3105-7 | oclc = | doi = | url = | accessdate = }}</ref> | * Normal reference range for anion gap is between 8 and 16 meq/L.<ref name="isbn0-683-18272-2">{{cite book | author = Benjamin Abelow | authorlink = | editor = | others = | title = Understanding acid-base | edition = | language = | publisher = Williams & Wilkins | location = Baltimore | year = 1998 | origyear = | pages = | quote = | isbn = 0-683-18272-2 | oclc = | doi = | url = | accessdate = }}</ref><ref name="isbn1-4160-3105-7">{{cite book | author = Rector, Floyd C.; Brenner, Barry M. | authorlink = | editor = | others = | title = Brenner & Rector's the kidney | edition = | language = | publisher = Saunders Elsevier | location = | year = 2008 | origyear = | pages = | quote = | isbn = 1-4160-3105-7 | oclc = | doi = | url = | accessdate = }}</ref> | ||
==References== | ==References== | ||
{{Reflist|2}} | {{Reflist|2}} | ||
{{WikiDoc Help Menu}} | |||
{{WikiDoc Sources}} | |||
[[Category:Critical pathways]] | |||
[[Category:Emergency medicine]] | |||
[[Category:Medicine]] | [[Category:Medicine]] | ||
[[Category:Nephrology]] | [[Category:Nephrology]] | ||
Latest revision as of 22:43, 29 July 2020
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Critical Pathways
metabolic acidosis critical pathways |
Anion gap | High | Normal | Low |
Definition
- Metabolic acidosis is a state in which the blood pH is less than 7.35 due to increased production of H+ by the body or the inability of the body to form bicarbonate (HCO3-) in the kidney.
- Anion gap = [Na+] - [Cl-] - [HCO3-]
- Normal reference range for anion gap is between 8 and 16 meq/L.[1][2]
References
- ↑ Benjamin Abelow (1998). Understanding acid-base. Baltimore: Williams & Wilkins. ISBN 0-683-18272-2.
- ↑ Rector, Floyd C.; Brenner, Barry M. (2008). Brenner & Rector's the kidney. Saunders Elsevier. ISBN 1-4160-3105-7.