Metabolic acidosis critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
WikiBot (talk | contribs)
m Bot: Removing from Primary care
 
(3 intermediate revisions by one other user not shown)
Line 2: Line 2:
{{CMG}}
{{CMG}}


==Approach==
==Critical Pathways==
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Metabolic acidosis critical pathways|metabolic acidosis critical pathways]]}}
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Metabolic acidosis critical pathways|metabolic acidosis critical pathways]]}}
Line 18: Line 18:
==References==
==References==
{{Reflist|2}}
{{Reflist|2}}
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}


[[Category:Critical pathways]]
[[Category:Emergency medicine]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Nephrology]]
[[Category:Nephrology]]
[[Category:Primary care]]
[[Category:Physician extender algorithm]]
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}

Latest revision as of 22:43, 29 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Critical Pathways

metabolic acidosis critical pathways
Anion gap High Normal Low

Definition

  • Metabolic acidosis is a state in which the blood pH is less than 7.35 due to increased production of H+ by the body or the inability of the body to form bicarbonate (HCO3-) in the kidney.
  • Anion gap = [Na+] - [Cl-] - [HCO3-]
  • Normal reference range for anion gap is between 8 and 16 meq/L.[1][2]

References

  1. Benjamin Abelow (1998). Understanding acid-base. Baltimore: Williams & Wilkins. ISBN 0-683-18272-2.
  2. Rector, Floyd C.; Brenner, Barry M. (2008). Brenner & Rector's the kidney. Saunders Elsevier. ISBN 1-4160-3105-7.

Template:WikiDoc Sources