Hyperkalemia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Rim Halaby (talk | contribs) Created page with "==Does the patient satisfy the criteria below for hyperkalemia?== ===The serum potassium concentration greater than 5.5 mEq/L.=== <br> <br> ====The patient may have hy..." |
Rim Halaby (talk | contribs) No edit summary |
||
Line 6: | Line 6: | ||
<br> | <br> | ||
====[[The patient may have hyperkalemia|Click here if the answer to the previous question is yes]]==== | ====[[The patient may have hyperkalemia|Click here if the answer to the previous question is yes]]==== | ||
<br> | |||
<br> |
Revision as of 00:51, 24 July 2013
Does the patient satisfy the criteria below for hyperkalemia?
The serum potassium concentration greater than 5.5 mEq/L.
Click here if the answer to the previous question is yes