Hyperkalemia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Rim Halaby (talk | contribs) No edit summary |
Mahmoud Sakr (talk | contribs) |
||
Line 1: | Line 1: | ||
== | ==Is your patient's [[potassium]] high?== | ||
===The serum potassium concentration greater than 5.5 mEq/L.=== | ===The serum potassium concentration greater than 5.5 mEq/L.=== |
Revision as of 15:36, 25 July 2013
Is your patient's potassium high?
The serum potassium concentration greater than 5.5 mEq/L.
Click here if the answer to the previous question is yes