Abdominal pain duration critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=cornflowerblue |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]] | | bgcolor=cornflowerblue |[[Abdominal pain smart algorithm|'''Abdominal Pain Smart Algorithm''']] | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=cornflowerblue |''' | | bgcolor=cornflowerblue |'''Hemodynamically Stable?'''|| bgcolor=lightyellow |[[Types of abdominal pain smart algorithm|Yes]]|| bgcolor=lightgray |[[Hemodynamic instability smart algorithm|No]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=cornflowerblue |Duration of abdominal pain|| bgcolor=lightgray |[[Acute abdominal pain smart algorithm|Acute abdominal pain]]|| bgcolor=lightgray |[[Chronic abdominal pain smart algorithm|Chronic abdominal pain]] | | bgcolor=cornflowerblue |Duration of abdominal pain|| bgcolor=lightgray |[[Acute abdominal pain smart algorithm|Acute abdominal pain (less than 6 months)]]|| bgcolor=lightgray |[[Chronic abdominal pain smart algorithm|Chronic abdominal pain (more than 6 months)]] | ||
|} | |} | ||
Revision as of 16:35, 26 July 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Smart Algorithm |
Hemodynamically Stable? | Yes | No |
Duration of abdominal pain | Acute abdominal pain (less than 6 months) | Chronic abdominal pain (more than 6 months) |
Definition
- Acute abdominal pain has a duration of less than 6 months.
- Chronic abdominal pain has a duration of more than 6 months.[1]
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.