Hyperkalemia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow | | | bgcolor=lightyellow |Potassium Level|| bgcolor=lightgray |[[The patient may have hyperkalemia|Higher than 5.5 mg/dL]]|| bgcolor=lightgray |[[Hyperkalemia|Lower than 5.5 mg/dL]] | ||
|} | |} | ||
Revision as of 22:15, 26 July 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Hyperkalemia Smart Algorithm |
Potassium Level | Higher than 5.5 mg/dL | Lower than 5.5 mg/dL |