High anion gap metabolic acidosis critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
No edit summary
Gerald Chi (talk | contribs)
No edit summary
Line 10: Line 10:
|}
|}
{| {{table}}
{| {{table}}
| bgcolor=lightyellow |Delta-delta value|| bgcolor= lightgray |[[Pure metabolic acidosis physician extender algorithm|Equal to 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]]
| bgcolor=lightyellow |Delta-delta (ΔΔ) value|| bgcolor= lightgray |[[Pure metabolic acidosis physician extender algorithm|Equal to 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]]
|}
|}


==Definition==
== Definition ==
* Delta-delta is defined as
* Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
* Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)


==References==
==References==

Revision as of 15:34, 1 August 2013

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Metabolic acidosis physician extender algorithm
Elevated anion gap? Yes No
Delta-delta (ΔΔ) value Equal to 1 Greater than 1 Less than 1

Definition

  • Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
  • Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)

References


Template:WikiDoc Sources