High anion gap metabolic acidosis critical pathways: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 16: Line 16:
* Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
* Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
* Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
* Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
** Delta anion gap (ΔAG) = (Calculated anion gap - Expected anion gap)
*** Calculated anion gap = [Na+] - [Cl-] - [HCO3-]
*** Expected anion gap = 2.5 x serum albumin level
** Delta bicarbonate (ΔHCO3) = 24 - serum bicarbonate level


==References==
==References==

Revision as of 15:40, 1 August 2013

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Metabolic acidosis physician extender algorithm
Elevated anion gap? Yes No
Delta-delta (ΔΔ) value Equal to 1 Greater than 1 Less than 1

Definition

  • Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
  • Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
    • Delta anion gap (ΔAG) = (Calculated anion gap - Expected anion gap)
      • Calculated anion gap = [Na+] - [Cl-] - [HCO3-]
      • Expected anion gap = 2.5 x serum albumin level
    • Delta bicarbonate (ΔHCO3) = 24 - serum bicarbonate level

References


Template:WikiDoc Sources