High anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 16: | Line 16: | ||
* Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not. | * Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not. | ||
* Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3) | * Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3) | ||
** Delta anion gap (ΔAG) = | ** Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap | ||
*** Calculated anion gap = [Na+] - [Cl-] - [HCO3-] | *** Calculated anion gap = [Na+] - [Cl-] - [HCO3-] | ||
*** Expected anion gap = 2.5 x serum albumin level | *** Expected anion gap = 2.5 x serum albumin level |
Revision as of 15:42, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Definition
- Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
- Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap
- Calculated anion gap = [Na+] - [Cl-] - [HCO3-]
- Expected anion gap = 2.5 x serum albumin level
- Delta bicarbonate (ΔHCO3) = 24 - serum bicarbonate level
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap