Abdominal pain with hemodynamic instability critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain with hemodynamic instability physician extender algorithm to Abdominal pain with hemodynamic instability critical pathways without leaving a redirect) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
==Definition== | ==Definition== | ||
==Action items== | |||
* Stabilize the patient by IV challenge. | |||
==References== | ==References== |
Revision as of 16:14, 14 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Definition
Action items
- Stabilize the patient by IV challenge.