High anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page High anion gap metabolic acidosis physician extender algorithm to High anion gap metabolic acidosis critical pathways without leaving a redirect) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Delta-delta (ΔΔ) value || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with metabolic alkalosis critical pathways|Greater than 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Pure high anion gap metabolic acidosis critical pathways|Between 1 and 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with normal anion gap metabolic | | BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Delta-delta (ΔΔ) value || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with metabolic alkalosis critical pathways|Greater than 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Pure high anion gap metabolic acidosis critical pathways|Between 1 and 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways|Less than 1]] | ||
|} | |} | ||
Revision as of 02:31, 11 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
metabolic acidosis critical pathways |
Anion gap | High | Normal | Low |
Delta-delta (ΔΔ) value | Greater than 2 | Between 1 and 2 | Less than 1 |
Definition
- Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
- Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap
- Calculated anion gap = [Na+] - [Cl-] - [HCO3-]
- Expected anion gap = 2.5 x serum albumin level
- Delta bicarbonate (ΔHCO3) = 24 - serum bicarbonate level
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap