Hyperkalemia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) m Gerald Chi moved page Hyperkalemia physician extender algorithm to Hyperkalemia critical pathways without leaving a redirect |
(No difference)
|
Revision as of 21:04, 11 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Hyperkalemia Physician Extender Algorithm |
Serum K+ Level | > 5.5 mg/dL | < 5.5 mg/dL |