Abdominal pain duration critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
==Approach== | ==Approach== | ||
{| {{table}} | |||
| bgcolor=#A1CAF1 border:1px|[[Abdominal pain smart algorithm|'''Abdominal pain smart algorithm''']] | |||
|} | |||
{| {{table}} | {| {{table}} | ||
| bgcolor=#A1CAF1 border:1px|'''Hemodynamically stable?'''||[[Types of abdominal pain smart algorithm|'''Yes''']]||[[Hemodynamic instability smart algorithm|'''No''']] | | bgcolor=#A1CAF1 border:1px|'''Hemodynamically stable?'''||[[Types of abdominal pain smart algorithm|'''Yes''']]||[[Hemodynamic instability smart algorithm|'''No''']] |
Revision as of 21:55, 25 July 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal pain smart algorithm |
Hemodynamically stable? | Yes | No |
Types of abdominal pain | Acute abdomen | Acute abdominal pain | Chronic abdominal pain |
Definition
- Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity.[1] It is less than 24 hours in duration and may require surgical evaluation and intervention.
- Acute abdominal pain usually has a duration of several days; subacute abdominal pain has a duration of more than several days but less than 6 months.
- Chronic abdominal pain has a duration of more than 6 months.[2]
References
- ↑ "ICD-10 Version:2010".
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.