Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=cornflowerblue |[[Abdominal pain smart algorithm| | | bgcolor=cornflowerblue |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} |
Revision as of 16:13, 26 July 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Smart Algorithm |
Hemodynamically Stable? | Yes | No |
Definition
- Abdominal pain is pain that you feel anywhere between your chest and groin.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.