Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 11: | Line 11: | ||
==Definition== | ==Definition== | ||
* Abdominal pain is pain felt anywhere between | * Abdominal pain is pain felt anywhere between the chest and the groin. | ||
* Immunocompromised and | * Immunocompromised and elderly patients may have atypical patterns of presentation. | ||
* A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. | * A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output. | ||
Revision as of 17:49, 26 July 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Smart Algorithm |
Hemodynamically Stable? | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.