Abdominal pain duration critical pathways: Difference between revisions

Jump to navigation Jump to search
m (Gerald Chi moved page Duration of abdominal pain smart algorithm to Abdominal pain duration smart algorithm without leaving a redirect)
No edit summary
Line 4: Line 4:
==Approach==
==Approach==
{| {{table}}
{| {{table}}
| bgcolor=paleturquoise |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]]
| bgcolor=lightyellow |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]]
|}
|}
{| {{table}}
{| {{table}}
| bgcolor=paleturquoise |Hemodynamically Stable?|| bgcolor=lightyellow |[[Types of abdominal pain smart algorithm|Yes]]|| bgcolor=lightgray |[[Hemodynamic instability smart algorithm|No]]
| bgcolor=lightyellow |Hemodynamically Stable?|| bgcolor=lightyellow |[[Types of abdominal pain smart algorithm|Yes]]|| bgcolor=lightgray |[[Hemodynamic instability smart algorithm|No]]
|}
|}
{| {{table}}
{| {{table}}
| bgcolor=paleturquoise |Duration of Abdominal Pain|| bgcolor=lightgray |[[Acute abdominal pain smart algorithm|Acute]]|| bgcolor=lightgray |[[Chronic abdominal pain smart algorithm|Chronic]]
| bgcolor=lightyellow |Duration of Abdominal Pain|| bgcolor=lightgray |[[Acute abdominal pain smart algorithm|Acute]]|| bgcolor=lightgray |[[Chronic abdominal pain smart algorithm|Chronic]]
|}
|}



Revision as of 18:11, 26 July 2013

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Abdominal Pain Smart Algorithm
Hemodynamically Stable? Yes No
Duration of Abdominal Pain Acute Chronic

Definition

  • Acute abdominal pain has a duration of less than 6 months.
  • Chronic abdominal pain has a duration of more than 6 months.[1]

References

  1. Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.

Template:WikiDoc Sources