Abdominal pain with hemodynamic instability critical pathways: Difference between revisions

Jump to navigation Jump to search
(Created page with "__NOTOC__ {{CMG}} ==Approach== {| {{table}} | bgcolor=paleturquoise |Abdominal Pain Smart Algorithm |} {| {{table}} | bgcolor=paleturquoise...")
 
No edit summary
Line 4: Line 4:
==Approach==
==Approach==
{| {{table}}
{| {{table}}
| bgcolor=paleturquoise |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]]
| bgcolor=lightyellow |[[Abdominal pain smart algorithm|Abdominal Pain Smart Algorithm]]
|}
|}
{| {{table}}
{| {{table}}
| bgcolor=paleturquoise |Hemodynamically Stable?||bgcolor=lightgray |[[Abdominal pain duration smart algorithm|Yes]]||bgcolor=lightyellow |[[Abdominal pain with hemodynamic instability smart algorithm|No]]
| bgcolor=lightyellow |Hemodynamically Stable?||bgcolor=lightgray |[[Abdominal pain duration smart algorithm|Yes]]||bgcolor=paleturquoise |[[Abdominal pain with hemodynamic instability smart algorithm|No]]
|}
|}



Revision as of 18:16, 26 July 2013

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Abdominal Pain Smart Algorithm
Hemodynamically Stable? Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources