High anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) Created page with "__NOTOC__ {{CMG}} ==Approach== {| {{table}} | bgcolor=lightyellow |Metabolic acidosis physician extender algorithm |} {| {..." |
Gerald Chi (talk | contribs) No edit summary |
||
Line 10: | Line 10: | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |Delta-delta value|| bgcolor= | | bgcolor=lightyellow |Delta-delta value|| bgcolor= lightgray |[[Pure metabolic acidosis physician extender algorithm|Equal to 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]] | ||
|} | |} | ||
Revision as of 15:23, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta value | Equal to 1 | Greater than 1 | Less than 1 |
Definition
- Delta-delta is defined as