High anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 10: | Line 10: | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |Delta-delta (ΔΔ) value|| bgcolor= lightgray |[[Pure metabolic acidosis physician extender algorithm|Equal to 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]] | | bgcolor=lightyellow |Delta-delta (ΔΔ) value|| bgcolor= lightgray |[[Pure high anion gap metabolic acidosis physician extender algorithm|Equal to 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=lightgray |[[Mixed high anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]] | ||
|} | |} | ||
Revision as of 15:59, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Definition
- Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
- Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap
- Calculated anion gap = [Na+] - [Cl-] - [HCO3-]
- Expected anion gap = 2.5 x serum albumin level
- Delta bicarbonate (ΔHCO3) = 24 - serum bicarbonate level
- Delta anion gap (ΔAG) = Calculated anion gap - Expected anion gap