Metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 18: | Line 18: | ||
{{Reflist|2}} | {{Reflist|2}} | ||
[[Category:Disease]] | |||
[[Category:Emergency medicine]] | |||
[[Category:Medicine]] | [[Category:Medicine]] | ||
[[Category:Nephrology]] | [[Category:Nephrology]] | ||
[[Category:Primary care]] | |||
[[Category:Physician extender algorithm]] | |||
{{WikiDoc Help Menu}} | {{WikiDoc Help Menu}} | ||
{{WikiDoc Sources}} | {{WikiDoc Sources}} |
Revision as of 20:44, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Definition
- Metabolic acidosis is a state in which the blood pH is less than 7.35 due to increased production of H+ by the body or the inability of the body to form bicarbonate (HCO3-) in the kidney.
- Anion gap = [Na+] - [Cl-] - [HCO3-]
- Normal reference range for anion gap is between 8 and 16 meq/L.[1][2]
References
- ↑ Benjamin Abelow (1998). Understanding acid-base. Baltimore: Williams & Wilkins. ISBN 0-683-18272-2.
- ↑ Rector, Floyd C.; Brenner, Barry M. (2008). Brenner & Rector's the kidney. Saunders Elsevier. ISBN 1-4160-3105-7.