Abdominal pain duration critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain duration smart algorithm to Abdominal pain duration physician extender algorithm without leaving a redirect) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |[[Abdominal pain | | bgcolor=lightyellow |[[Abdominal pain physcian extender algorithm|Abdominal Pain Physician Extender Algorithm]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} |
Revision as of 14:57, 2 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Physician Extender Algorithm |
Hemodynamically Stable? | Yes | No |
Duration of Abdominal Pain | Acute | Chronic |
Definition
- Acute abdominal pain has a duration of less than 6 months.
- Chronic abdominal pain has a duration of more than 6 months.[1]
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.