Abdominal pain with hemodynamic instability critical pathways: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
|}
|}
{| {{table}}
{| {{table}}
| bgcolor=LIGHTYELLOW |Hemodynamically Stable?||bgcolor=LIGHTGRAY |[[Abdominal pain duration physician extender algorithm|Yes]]||bgcolor=MEDIUMAQUAMARINE |[[Abdominal pain with hemodynamic instability physician extender algorithm|No]]
| bgcolor=LIGHTYELLOW |Hemodynamically stable?||bgcolor=LIGHTGRAY |[[Abdominal pain duration physician extender algorithm|Yes]]||bgcolor=MEDIUMAQUAMARINE |[[Abdominal pain with hemodynamic instability physician extender algorithm|No]]
|}
|}



Revision as of 15:14, 2 August 2013

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Abdominal pain physician extender algorithm
Hemodynamically stable? Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources