Abdominal pain duration critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
{{CMG}} | {{CMG}} | ||
==Approach== | |||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor= | | bgcolor=LIGHTYELLOW |[[Abdominal pain physician extender algorithm|Abdominal pain physician extender algorithm]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor= | | bgcolor=LIGHTYELLOW |Hemodynamically stable?||bgcolor=LIGHTGRAY |[[Abdominal pain duration physician extender algorithm|Yes]]||bgcolor=MEDIUMAQUAMARINE |[[Abdominal pain with hemodynamic instability physician extender algorithm|No]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} |
Revision as of 15:14, 2 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Approach
Abdominal pain physician extender algorithm |
Hemodynamically stable? | Yes | No |
Duration of Abdominal Pain | Acute | Chronic |
Definition
- Acute abdominal pain has a duration of less than 6 months.
- Chronic abdominal pain has a duration of more than 6 months.[1]
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.