Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 8: | Line 8: | ||
{|CELLPADDING=20 STYLE="WIDTH:80%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:80%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=LIGHTYELLOW | Hemodynamically stable? || BGCOLOR=LIGHTGRAY | [[Abdominal pain duration critical pathways|Yes]] || BGCOLOR=LIGHTGRAY | [[Abdominal pain with hemodynamic instability critical pathways|No]] | | BGCOLOR=LIGHTYELLOW | Hemodynamically stable? || BGCOLOR=LIGHTGRAY | [[Abdominal pain duration critical pathways|Yes]] || BGCOLOR=LIGHTGRAY | [[Abdominal pain with hemodynamic instability critical pathways|No]] | ||
|} | |} | ||
==Definition== | ==Definition== |
Revision as of 22:10, 10 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal pain critical pathways |
Hemodynamically stable? | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.