Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
==Approach== | ==Approach== | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE | [[Abdominal pain critical pathways|Abdominal | | BGCOLOR=FLORALWHITE STYLE="FONT-SIZE:200%" ALIGN=CENTER | [[Abdominal pain critical pathways|Abdominal Pain Critical Pathways]] | ||
|} | |} | ||
Revision as of 22:35, 10 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Critical Pathways |
Hemodynamically stable | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.