Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
==Approach== | ==Approach== | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT: | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:25px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE ALIGN=CENTER | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}} | | BGCOLOR=FLORALWHITE ALIGN=CENTER | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}} | ||
|} | |} |
Revision as of 22:36, 10 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.