Abdominal pain with hemodynamic instability critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain with hemodynamic instability physician extender algorithm to Abdominal pain with hemodynamic instability critical pathways without leaving a redirect) |
(No difference)
|
Revision as of 00:27, 11 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |