Abdominal pain with hemodynamic instability critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Critical Pathways
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Definition
- Hemodynamic status
Action items
- Stabilize the patient by IV challenge.