Back pain critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Critical Pathways
back pain critical pathways |
Question 1 | ANSWER 1 | ANSWER 2 |
Definition
- Back pain is pain felt in the back that may originate from the muscles, nerves, bones, joints or other structures in the spine.
References