Acute abdominal pain location critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Duration of abdominal pain | Acute | Chronic |
Acute abdomen | Likely | Unlikely |
Location of abdominal pain | diffuse | ||
right upper | epigastric | left upper | |
right flank | periumbilical | left flank | |
right lower | hypogastric | left lower |