Hyperkalemia critical pathways

Revision as of 00:48, 24 July 2013 by Rim Halaby (talk | contribs) (Created page with "==Does the patient satisfy the criteria below for hyperkalemia?== ===The serum potassium concentration greater than 5.5 mEq/L.=== <br> <br> ====The patient may have hy...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Does the patient satisfy the criteria below for hyperkalemia?

The serum potassium concentration greater than 5.5 mEq/L.



Click here if the answer to the previous question is yes