High anion gap metabolic acidosis with metabolic alkalosis critical pathways

Revision as of 15:50, 1 August 2013 by Gerald Chi (talk | contribs) (Created page with "__NOTOC__ {{CMG}} ==Approach== {| {{table}} | bgcolor=lightyellow |Metabolic acidosis physician extender algorithm |} {| {...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Metabolic acidosis physician extender algorithm
Elevated anion gap? Yes No
Delta-delta (ΔΔ) value Equal to 1 Greater than 1 Less than 1

Action Item

  • Consider the coexistence of [[Metabolic acidosis causes #High Anion Gap | high anion gap metabolic acidosis and metabolic alkalosis.


References


Template:WikiDoc Sources