High anion gap metabolic acidosis with metabolic alkalosis critical pathways

Revision as of 15:51, 1 August 2013 by Gerald Chi (talk | contribs)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

Metabolic acidosis physician extender algorithm
Elevated anion gap? Yes No
Delta-delta (ΔΔ) value Equal to 1 Greater than 1 Less than 1

Action Item

  • Consider the coexistence of [[Metabolic acidosis causes#High Anion Gap | high anion gap metabolic acidosis and metabolic alkalosis.


References


Template:WikiDoc Sources