High anion gap metabolic acidosis with metabolic alkalosis critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Action Item
- Consider the coexistence of [[Metabolic acidosis causes#High Anion Gap|high anion gap metabolic acidosis and metabolic alkalosis.