Normal anion gap metabolic acidosis critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Action Item
- Consider the coexistence of high anion gap metabolic acidosis and metabolic alkalosis.