Abdominal pain with hemodynamic instability critical pathways

Revision as of 16:14, 14 August 2013 by Gerald Chi (talk | contribs)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

Action items

  • Stabilize the patient by IV challenge.

References


Template:WikiDoc Sources