Abdominal pain with hemodynamic instability critical pathways

Revision as of 16:16, 14 August 2013 by Gerald Chi (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Critical Pathways

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

  • Hemodynamic status

Action items

  • Stabilize the patient by IV challenge.

References


Template:WikiDoc Sources