Tachycardia with pulse hemodynamically stable critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) mNo edit summary |
m (Bot: Removing from Primary care) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 23: | Line 23: | ||
==Action Items== | ==Action Items== | ||
* Perform 12-lead ECG. | |||
==References== | ==References== | ||
Line 31: | Line 31: | ||
[[Category:Emergency medicine]] | [[Category:Emergency medicine]] | ||
[[Category:Medicine]] | [[Category:Medicine]] | ||
Latest revision as of 00:23, 30 July 2020
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]
Critical Pathways
Tachycardia Critical Pathways |
Presence of pulse? | Yes | No |
Hemodynamically stable? | Yes | No |
Wide QRS complex? | Yes | No |
Definitions
- Wide QRS complex is defined as a QRS complex with a duration of ≥120 ms.
Action Items
- Perform 12-lead ECG.