Tachycardia with pulse hemodynamically stable critical pathways: Difference between revisions

Jump to navigation Jump to search
Gerald Chi (talk | contribs)
WikiBot (talk | contribs)
m Bot: Removing from Primary care
 
(2 intermediate revisions by 2 users not shown)
Line 23: Line 23:


==Action Items==
==Action Items==
* Perform 12-lead ECG; do not delay therapy.
* Perform 12-lead ECG.


==References==
==References==
Line 31: Line 31:
[[Category:Emergency medicine]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Primary care]]
[[Category:Signs and symptoms]]

Latest revision as of 00:23, 30 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]

Critical Pathways

Tachycardia Critical Pathways
Presence of pulse? Yes No
Hemodynamically stable? Yes No
Wide QRS complex? Yes No

Definitions

  • Wide QRS complex is defined as a QRS complex with a duration of ≥120 ms.

Action Items

  • Perform 12-lead ECG.

References