Tachycardia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Steven Bellm (talk | contribs) Created page with "__NOTOC__ {{CMG}}; {{AE}} {{Steven}} ==Critical Pathways== {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | BGCOLOR=FLORALWHITE style="text-align: center;" | Ta..." |
Steven Bellm (talk | contribs) No edit summary |
||
Line 8: | Line 8: | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| | | BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Wide QRS-Complex || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain duration critical pathways|Yes ]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain with hemodynamic instability critical pathways|No]] | ||
|} | |} | ||
==Definitions== | ==Definitions== | ||
* Tachycardia is defined as a heart rate of greater than 100 beats/min. | * Tachycardia is defined as a heart rate of greater than 100 beats/min. | ||
* Wide QRS if 3 or more QRS>0,12 s | |||
==Action Items== | |||
* Maintain patent airway | |||
* Maintain i.v. access | |||
* Assist breathing as needed | |||
* Administer oxygen if hypoxemic | |||
* Monitor blood pressure, oximetry and attach ECG monitor/defibrillator | |||
==References== | ==References== |
Revision as of 15:10, 27 February 2015
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]
Critical Pathways
Tachycardia Critical Pathways |
Wide QRS-Complex | Yes | No |
Definitions
- Tachycardia is defined as a heart rate of greater than 100 beats/min.
- Wide QRS if 3 or more QRS>0,12 s
Action Items
- Maintain patent airway
- Maintain i.v. access
- Assist breathing as needed
- Administer oxygen if hypoxemic
- Monitor blood pressure, oximetry and attach ECG monitor/defibrillator