Tachycardia critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) mNo edit summary |
Gerald Chi (talk | contribs) mNo edit summary |
||
Line 8: | Line 8: | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| | | BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Presence of pulse? || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Tachycardia with pulse critical pathways|Yes]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Tachycardia without pulse critical pathways|No]] | ||
|} | |} | ||
Line 16: | Line 16: | ||
==Action Items== | ==Action Items== | ||
* | * Perform a carotid pulse check. | ||
==References== | ==References== |
Revision as of 18:31, 27 February 2015
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]
Critical Pathways
Tachycardia Critical Pathways |
Presence of pulse? | Yes | No |
Definitions
- Tachycardia is defined as an arrhythmia with a rate of ≥100 beats per minute. Clinically significant tachycardia refers to an arrhythmia rate of ≥150 beats per minute.
- Wide QRS complex is defined as a QRS complexes with a duration of ≥0.12 second.[1]
Action Items
- Perform a carotid pulse check.
References
- ↑ Neumar, Robert W.; Otto, Charles W.; Link, Mark S.; Kronick, Steven L.; Shuster, Michael; Callaway, Clifton W.; Kudenchuk, Peter J.; Ornato, Joseph P.; McNally, Bryan; Silvers, Scott M.; Passman, Rod S.; White, Roger D.; Hess, Erik P.; Tang, Wanchun; Davis, Daniel; Sinz, Elizabeth; Morrison, Laurie J. (2010-11-02). "Part 8: adult advanced cardiovascular life support: 2010 American Heart Association Guidelines for Cardiopulmonary Resuscitation and Emergency Cardiovascular Care". Circulation. 122 (18 Suppl 3): –729-767. doi:10.1161/CIRCULATIONAHA.110.970988. ISSN 1524-4539. PMID 20956224.