Tachycardia with pulse hemodynamically stable critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) mNo edit summary |
Gerald Chi (talk | contribs) m (→Action Items) |
||
Line 23: | Line 23: | ||
==Action Items== | ==Action Items== | ||
* Perform 12-lead ECG; do not delay therapy. | |||
==References== | ==References== |
Revision as of 19:02, 27 February 2015
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]
Critical Pathways
Tachycardia Critical Pathways |
Presence of pulse? | Yes | No |
Hemodynamically stable? | Yes | No |
Wide QRS complex? | Yes | No |
Definitions
- Wide QRS complex is defined as a QRS complex with a duration of ≥120 ms.
Action Items
- Perform 12-lead ECG; do not delay therapy.