Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) Created page with "__NOTOC__ {{Abdominal pain}} {{CMG}} ==Definition== Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web | last ..." |
Gerald Chi (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
{{CMG}} | {{CMG}} | ||
==Definition== | ==Definition== | ||
Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity. | * Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity. It is less than 24 hours in duration and may require surgical evaluation and intervention. | ||
* Acute abdominal pain | |||
* Chronic abdominal pain |
Revision as of 12:24, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Definition
- Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity. It is less than 24 hours in duration and may require surgical evaluation and intervention.
- Acute abdominal pain
- Chronic abdominal pain