Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
{{CMG}} | {{CMG}} | ||
==Definition== | ==Definition== | ||
* Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity. It is less than 24 hours in duration and may require surgical evaluation and intervention. | * '''Acute abdomen''' is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web | last = | first = | title = ICD-10 Version:2010 | url = http://apps.who.int/classifications/icd10/browse/2010/en#/R10.0 | publisher = | date = }}</ref> It is less than 24 hours in duration and may require surgical evaluation and intervention. | ||
* | |||
* Chronic | * Duration of abdominal pain | ||
** Acute: several days | |||
** Subacute: more than several days but less than 6 months | |||
** Chronic: more than six months, either constantly or intermittently | |||
* Immunocompromised and older patients may have atypical patterns of presentation. | |||
==References== | |||
{{Reflist|2}} | |||
{{WikiDoc Help Menu}} | |||
{{WikiDoc Sources}} | |||
[[Category:Disease]] | |||
[[Category:Medicine]] | |||
[[Category:Resident survival guide]] |
Revision as of 15:46, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Definition
- Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity.[1] It is less than 24 hours in duration and may require surgical evaluation and intervention.
- Duration of abdominal pain
- Acute: several days
- Subacute: more than several days but less than 6 months
- Chronic: more than six months, either constantly or intermittently
- Immunocompromised and older patients may have atypical patterns of presentation.