Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 3: | Line 3: | ||
{{CMG}} | {{CMG}} | ||
==Definition== | ==Definition== | ||
* Abdominal pain is considered acute if the duration is less than six months and chronic when it has been occurring over at least six months, either constantly or intermittently.<ref>{{Cite book | last1 = Sleisenger | first1 = Marvin H. | last2 = Feldman | first2 = Mark | last3 = Friedman | first3 = Lawrence S. (Lawrence Samuel) | last4 = Brandt | first4 = Lawrence J. | title = Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen | date = 2010 | publisher = Saunders/Elsevier | location = Philadelphia , PA | isbn = 1-4160-6189-4 | pages = }}</ref> | |||
* '''Acute abdomen''' is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web | last = | first = | title = ICD-10 Version:2010 | url = http://apps.who.int/classifications/icd10/browse/2010/en#/R10.0 | publisher = | date = }}</ref> It is less than 24 hours in duration and may require surgical evaluation and intervention. | * '''Acute abdomen''' is defined as severe localized or generalized abdominal pain with abdominal rigidity.<ref>{{Cite web | last = | first = | title = ICD-10 Version:2010 | url = http://apps.who.int/classifications/icd10/browse/2010/en#/R10.0 | publisher = | date = }}</ref> It is less than 24 hours in duration and may require surgical evaluation and intervention. | ||
==Approach== | |||
{| {{table}} | |||
| bgcolor=#A1CAF1 border:1px|'''Hemodynamic instability?'''||[[Hemodynamic instability smart algorithm|'''Yes''']]||[[differential diagnosis project|'''No''']] | |||
|} | |||
==References== | ==References== |
Revision as of 17:01, 25 July 2013
Abdominal pain Microchapters |
Diagnosis |
---|
Treatment |
Case Studies |
Abdominal pain On the Web |
American Roentgen Ray Society Images of Abdominal pain |
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Definition
- Abdominal pain is considered acute if the duration is less than six months and chronic when it has been occurring over at least six months, either constantly or intermittently.[1]
- Acute abdomen is defined as severe localized or generalized abdominal pain with abdominal rigidity.[2] It is less than 24 hours in duration and may require surgical evaluation and intervention.
Approach
Hemodynamic instability? | Yes | No |
References
- ↑ Sleisenger, Marvin H.; Feldman, Mark; Friedman, Lawrence S. (Lawrence Samuel); Brandt, Lawrence J. (2010). Sleisenger and Fordtran's gastrointestinal and liver disease : pathophysiology, diagnosis, managemen. Philadelphia , PA: Saunders/Elsevier. ISBN 1-4160-6189-4.
- ↑ "ICD-10 Version:2010".